Jump to content


Julesss

Members
  • Posts

    1
  • Joined

  • Last visited

Everything posted by Julesss

  1. I purchased an Audi Etron 55 in March and had Pod Point 7KW Home Charge Unit installed at my house. The charge cable Audi supplied is a Type 2-Type 2 20A 480V cable. Using this cable with Pod Point charger, when my battery was 77% charged, the charge time given was 12hours 23 minutes to charge 23%!! Audi advertise a (100%) charge time of 10.5 hours (AC 7KW home wallbox). I think that the charge cable supplied with the new car is not sufficient to draw 7KW. The 20A cable can only draw 4.8KW (20Ax240V). Should Audi have supplied a 32A cable as standard?. Has anyone else had this problem & taken it up with Audi. At this rate, a full 100% charge using my Home Charge Unit would take 48 hours, which is not acceptable. I have had to resort to using the rapid charger point, 5 minutes drive from my house, where the charge point has its own cable. This takes just 2 hours to charge from 15% to 100%.
×
×
  • Create New...

Forums


News


Membership